Cherry Fields minutes May 2026

Minutes of Cherry Willingham Parish Council’s Cherry Fields Committee
held on Wednesday, 13th May 2026 at 19.00 in the Millennium Hall

Chair of the Committee: Cllr J. Robinson
Vice-Chair of the Committee: N. Hooper

Present: Cllrs J. Robinson, B. Robinson, A. Burge, and co-opted members: A Gardner, N. Hooper,
D. Leonard and H. McCowan. (Initials used in minutes below.)
1. To note and record apologies and absences
Apologies were received from Cllrs. P. Bucke and J. Trahearn, and C. Bochel.
2. To receive any declarations of interest in accordance with the Localism Act 2011 and
consider any requests for dispensations in relation to Disclosable Pecuniary Interests or
other interests as outlined in the Council’s Code of Conduct.
Nothing to record.
3. To receive the draft notes of the Cherry Fields Committee Meeting held on Wednesday,
1
st April and approve as Minutes.
It was resolved to accept the Minutes.
4. To receive a report on the Expenditure v Budget figures to date. (NH)
*Maintenance – Little has been spent so far this year.
*Projects – NH highlighted the need to be clear on the total amount allocated for the BHP
scheme from the various sources of funding to assist with planning resources.
An Oasis development budget of £10k is to be proposed at Full Council next week.
5. To receive an update on matters relating to potential grant applications and donations
The application has been submitted to Wickes for donations and the acknowledgement said we
qualified. The format is different now. Previously it required visiting the store manager but now we
have to wait for them to contact us. HM will visit sometime and try to speak to them. Action: HM
6. To receive an update on the “behind the hedge” path and agree any actions and
expenditure as required (NH/BR)
The bridge is nearly finished and just requires handrails. The farm access gate has been moved
back but needs some support refitting to the centre. Action: BR
AG has informed the IDB about the culvert and sent photos, so the paperwork is now completed.
There is a gap near the Fenland Hideaway which will require some posts and the already
constructed gate to fill it.
The excavator is coming tomorrow to make the path more level and enable drainage pipes to be
installed to allow water to pass under the path.
The rape seed crop is growing tall and bending over the new hedge. BR to speak to the farmer
about removing plants near the hedge, as they will not be able to harvest them without damaging
the hedge. Action: BR
The entrance near the pump house, opp. Waterford Lane, needs improvement to stop children
potentially running straight out into the road. Any barrier would have to be removable to allow
machinery access when required. Various options were discussed and this will be considered
further.
The donated bench is being delivered on 28th May to AB. It will then have to be moved to site.
Action: AB
The cast iron water trough, which was a safety issue, has been removed. DR’s plough has finally
been removed from the mud.

CWPC CFC Minutes 13/05/2026 Page 2 of 8
DR and BR have used quite a bit of time moving soil so far and their reimbursement costs will be
submitted.
Thank you to all the volunteers for their hard work on this project.
JR has got a team of people who will check the path on a regular basis and report any issues,
plus remove litter.
7. To receive an update regarding the Oasis area and agree any actions as required,
including:
a. Recommending to Full Council the purchase of shipping containers for storage
(expected cost between £3200 and £6600).
b. Agreeing other expenditure required for the disposal of unwanted materials.
c. Discussing the offer made by the Co-op Community Co-ordinator to help with a
green space project.
a) Containers will provide safe storage for our equipment. There was a long discussion on the
merits of a 10ft or 20ft container, including how they could be delivered to site. It was finally
agreed to purchase one 10ft container, with the possibility of purchasing another in the future
if the need could be proved. An anti-condensation coating on the inside would be beneficial.
It was resolved to purchase one 10ft container at a cost of up to £3500. Action: BR
b) BR reported that the local garage said their supplier charged £1.20 per tyre for removal. He
has the contact details of the company and will contact them. Skips will be required for
removal of many bathtubs and other items not required. It was resolved to spend up to £600
for up to 2 skips and £400 for removal of tyres. Action: NH/BR
All the tyres will need to be collected in one place prior to collection.
The tools and garden equipment which have been left on site need to be sorted to decide
which should be retained and which can go to allotment holders, gardeners and other
residents. Cash donations will be requested for any item taken. The event will be advertised
prior to this. It was agreed that Saturday 20th June would be earmarked as the date for tool
disposal from 10.00am to 4.00pm. Volunteers would need to be there for 9.00am to get the
equipment out. Action: All
AB agreed to dispose of any pallets on site. Action: AB
c) The Co-op community co-ordinator has contacted CWPC to find out who was now running the
Oasis, in order to offer assistance with a green space project. JR has contacted them and is
awaiting a reply. Previous contact suggests they need a lot of warning for an event so JR will
ask them to suggest a date. Action: JR
8. To receive an update on actions taken to show the main track from the road to the river as
a permissive path on OS Leisure maps and agree any actions as required.
Written permission has now been obtained from LCC. The Clerk has been asked to pass this
and the FC resolution on to the OS.
9. To receive an update on the LCC’s Countryside Walks for All series walk leaflet for Cherry
Fields.
The leaflets have now been produced, and the PC will ask for some copies. Action: JR
10. To receive a report on work undertaken since the last meeting. (NH/BR)
*NH presented this report and the volunteers were thanked for their continued hard work.
11. To review any matters arising from recent H & S inspections and agree any actions still
required.
NH reported that the monthly inspections are raising more items which require attention.
The following rota was confirmed: May – PB/JT, June – NH, July – AG, Aug – DL.

CWPC CFC Minutes 13/05/2026 Page 3 of 8
DL agreed to take on the role of coordinating and checking that actions had been completed.
12. To review the programme of works for the forthcoming months and agree associated
expenditure, including: (NH/BR)
a. Purchasing a pack of stakes for the Community Orchard.
*The report of work required was presented and it was resolved to purchase some new stakes for
the orchard at a cost of £35.
BR reported that some more planings were required. This was resolved at a cost up to £300.
13. To review plans for celebrating 10 years of Cherry Fields in 2026 and agree actions as
required.
AW has agreed to do a speech, and she will be introduced by the Chair of the PC.
An accessible Portaloo has been ordered for the weekend. JR will look at using some bunting to
make the area more festive. It is understood that the EA are sending a representative.
A poster will be in Cherry News in June and a reminder in July, plus Facebook. Risk
assessments will be done separately for the bike trials and children’s games.
It was felt that the PC gazebo would be useful on the Saturday, at least. A collection of photos
and historical finds will be available to view.
14. To receive an update concerning the description of Cherry Fields on the DogPack website
HM reported that the wording of the main description had not been changed, but a review had
been added from the PC to say that dogs must be kept on a lead in the majority of the site,
except the dog exercise area and path to the river. Owners were also requested to use the waste
bin at the entrance. HM has added a second review reiterating these comments. She noted that
CF could not be found on the website without searching for the site by name on Google, then
clicking the link to the DogPack site. So very few dog owners will find us this way.
15. To receive an update on matters relating to the roe deer and future sculptures and agree
any actions required.
Nothing to report.
16. To receive brief reports from members on actions/issues arising since the last meeting
and resolve actions required (if not itemised on agenda above and dealt with already):
a) Health and Safety (AG/NH/BR) – NH reported an infestation of the brown tailed moth larvae
on the Oasis. They can cause rashes and respiratory illness. It was agreed to purchase
spray for up to £50. Action: NH
b) Grants (HM) – Nothing further to report
c) Dyke maintenance (AG) - Nothing further to report
d) Pond maintenance (NH/BR) – NH has removed some more bullrushes.
e) General path/track and site maintenance (BR/NH) - Nothing further to report
f) Grass Cutting (NH/BR) – BR asked the contractor not to cut the woodland walk, but he also
did not cut the long mound. It will need strimming. The contractor will mow the relevant areas
before the dog show.
g) Woodland and Meadow Project (NH) - Nothing further to report.
h) Orchard (NH) – There has been no response to the re-issued advert for a volunteer to
manage the orchard.
i) Dog exercise area and off lead strip – Adverts for the Dog Show on 6th June are up.
j) Wildlife Camera (BR) – BR will relocate to the Oasis sometime. Action: BR
k) Bike Track (BR) – doing well but the stoned surface has been rubbed off some humps.
l) Car Park and Gate-opening and closing (BR) – DL has agreed to install the replacement
signs. Action: DL
m) Oasis (CB) – already dealt with.

CWPC CFC Minutes 13/05/2026 Page 4 of 8
17. General: Any other matters to report for inclusion in the next agenda.
The next meeting on 17th June will be a short one to elect a Chair and co-opt members. The only
other items will be the 10th Anniversary celebrations, the Oasis and BHP.
18. To confirm the date of the next meeting as Wednesday 17th June at 7pm. (Further
meetings already planned: 8th July, 26th August, 11th November.)
This date was confirmed.
The meeting closed at 8:55pm.
Signed ........................................
*Additional documents follow as appendices.

CWPC CFC Minutes 13/05/2026 Page 5 of 8

Appendix A: Projects budgets update

Available project funds :-
PC projects :-
Natural play equipment £1,000
Total PC funded projects £1,000
Grants and donations :-
- Carried forward £1,096
Total grants and donations £1,096
Orchard budget :-
- Carried forward £531
Total Orchard funds £531
Behind the Hedge Path budget :-
- Carried forward £2,370
- Additional allocation of CIL funds TBC
Total Behind the Hedge Path funds 2370
Oasis restoration and development allocation :-
- Total Oasis allocation TBC
Expenditure of PC projects funds :-
Unallocated £1,000

Total PC funded projects £1,000 £1,000
Expenditure of grants or donations:-

Unallocated £1,096
Total grant and donation funded projects £0 £1,096 £1,096
Expenditure of Orchard funds:-
Grease bands etc £100
Unallocated £431
Total community orchard fund projects £0 531 £531
Expenditure of Behind the Hedge Path project funds :-
Legal fees £1,600
First cut of existing hedge £600

CWPC CFC Minutes 13/05/2026 Page 6 of 8
Digger hire £130
Timber and fixings for culvert bridge handrails £40
£130 £2,240 £2,370

Estimated Oasis development and restoration costs :-
Purchase of 2 x 10 foot steel storage containers £6,600
Materials for raised base for containers £600
Digger hire for raised base construction £125
Skip £500
Tyre disposal £300
Volunteer plant use £250
Fuel for power tools £40
Grass cutting contract £200
Gas safety check £100
Improvements £1,000
Contingencies £300
£10,015
Appendix B: Maintenance budgets update
Allocation for contract mowing £2000
Allocation for inspections £100
Allocation for general maintenance £3000
Item Actual Estimate Total
Contract mowing (paths and picnic areas):-
April £403
May £214
June £403
July £214
August £214
September £214
October £214
Unallocated £124
Total contract mowing £403 £1,597 £2,000

Inspections:-
Annual cycle track inspection £100
Unallocated
Total inspections £100 £100
Other maintenance:-
Witham Third drainage rates £100
Volunteer fuel costs remaining budget (£900 allocated):-
BR
DR
Remaining unallocated sum

CWPC CFC Minutes 13/05/2026 Page 7 of 8
Replacement car park signs £56
Unallocated £2,844
Total other maintenance £56 £2,944 £3,000

Appendix C: Note of volunteer work undertaken between 25 March and 1 May 2026

Project development
No further project development work was undertaken on the main Cherry Fields area, but preparatory to
absorbing the Oasis site, the area has been inspected, an audit of contents undertaken and a scale plan
drawn up. The overgrown willow hedge, which was shading out the orchard trees, has mostly been cut down
and stumps treated with glyphosate to prevent regrowth. Cut material will be stacked to create a new habitat
pile for overwintering mammals and amphibians.
Maintenance
During the last 6 weeks the volunteer group has completed a range of maintenance tasks including :-
• Infilling ruts created during winter path work
• Reinstating the reservoir log dam
• Replacing and repainting car parking studs
• Refilling the lagoon from the reservoir on two occasions
• A range of small repair jobs arising from monthly inspections
Community orchard
No further work has been required.
Behind the Hedge Path
The inner face of the hedge has been mown and double gate posts removed. The crop of rape growing on the
leased strip has been flailed down and an additional safety fence built next to the steeply sloping western
drain. A large pile of logs left over from a fallen dead tree have been removed and an inaccessible length of
hedge trimmed by hand.
The crossing point from Cherry fields has been raised to create a 5 degree slope (for all ability access) and
stone donated by W3IDB, used to construct revetment walls around the steel pipe.
A length of hedge at the Fenland Hideaway entrance has also been lowered to improve pedestrian visibility
at the junction.
A digger has been hired to auger holes so that the double gate posts could be reinstalled in line with the new
hedge line. The digger was also used to help install gate posts at the Fenland Hideaway and start raising the
path surface where it passes the four wet sections with donated soil and lengths of temporary drainage pipe
installed where appropriate.
Potential hazards, including a water filled trough and barbed wire have been removed from the path route.
Volunteer input (between 25 March and 1 May 2026)
Project development 2 person days
Maintenance 6 person days
Gate opening 3 person days
Total Cherry Fields 11 person days
Behind the Hedge Path 13.5 person days

CWPC CFC Minutes 13/05/2026 Page 8 of 8
Appendix D: Project and maintenance work required over the coming months

Maintenance
The plastic inlet drainage pipe for the new dog area drainage pond is rather unsightly and, as soon as the
water level falls, a stone revetment will be constructed using material donated by the W3IDB.
It would be prudent to protect the timber of the Delph bridge and riverbank steps over the coming months
using our stock of preservative.
Sections of the cycle track have begun to sink into the peaty soil of Cherry Holt and have become wet and
muddy. These will need raising by adding more road material from existing stocks.
Once the BHP is open, the volunteers will be turning their attention to constructing the proposed downhill
cycle track alongside the main access track using existing stocks of subsoil.
The main access track is the most used section of the Cherry Fields path network and sections have begun
to wear out. This may require a significant resurfacing effort over the summer involving a significant amount
of fresh sweepings and hire of a roller. Costs will be presented to a future meeting.
Project development
Much of the work on the Behind the Hedge Path (planting a hedge, relocating agricultural access gates and
building a culvert bridge) has been completed. There are however still a number of tasks to complete before
the path can be opened to the public. These include :-
• Installing the signage (on order)
• Completing pedestrian safety gates at the Fenland Hideaway
• Surfacing the culvert bridge with compacted planings
• Constructing handrails on the culvert bridge
• Dealing with five sections which suffered from water ponding over the winter
• Levelling out potentially hazardous sections of the route
The last two tasks have proved to be more challenging than anticipated and additional digger hire costs will
be involved in completing the work.
Wildflower meadow seed and a sand carrier were purchased in March, but subsequent the extended dry
spell has made it impossible to prepare the ground for sowing. Consequently, it is planned to defer sowing
until the autumn, when conditions should be more conducive to effective germination.
Oasis restoration and development project
The purchase of two 10 foot shipping containers (at a cost of around £6,600) to store higher value assets for
Cherry Fields (mowers, strimmers, pumps etc), which could be located within the Oasis site would prove a
valuable long-term asset. In order to protect the contents from potential flood damage however, the
construction of raised plinths is also likely to be required. While the Parish Council is considering options for
the future uses of the site, work to make it safe and remove materials which will not be required (tools,
plastics, broken greenhouses, chicken run and tyres) will continue. Tyres are classed as controlled waste
(because the toxins they contain can leach into the soil) and their disposal will need to involve a specialist
contractor and may cost up to £300 and possibly considerably more. Although as many other materials as
possible (eg metals and timber) will be reused or recycled, it will be necessary to hire a large (20 m2 ro-ro
container) skip to dispose of the remainder (eg bath tubs) which may cost around £500.
Community orchard
Broken stakes on the deer protection baskets will continue to be replaced from the stock purchased in 2026,
but more are likely to be required shortly. A pack of stakes costs around £35.