Cherry Fields minutes August 2026
Minutes of Cherry Willingham Parish Council’s Cherry Fields Committee
held on Wednesday 26th August 2026 at 19.00 in the Millennium Hall
Chair of the Committee: Cllr J. Robinson
Vice-Chair of the Committee: N. Hooper
Present: Cllrs J. Robinson, B. Robinson, A. Burge, and co-opted members: C. Bochel, A Gardner, N. Hooper, D. Leonard and H. McCowan. (Initials used in minutes below.)
-
To note and record apologies and absences.
Apologies were recorded from Cllrs J. Trahearn and G. Shaw.
Cllr P. Bucke was noted as absent.
-
To receive any declarations of interest in accordance with the Localism Act 2011 and consider any requests for dispensations in relation to Disclosable Pecuniary Interests or other interests as outlined in the Council’s Code of Conduct.
None were declared.
-
To receive the draft notes of the Cherry Fields Committee Meeting held on Friday, 26th June 2026 and approve as Minutes.
The minutes of the June meeting were approved.
-
To receive a report on the Expenditure v Budget figures to date. (NH)
*NH presented the updated budget figures.
The amount for the Oasis tool collection has increased with further sales on the anniversary day.
£1000 of project funds remains unallocated at present. It was noted that the accumulated grant and donation monies which should have carried-over from 2025/6 is not showing up in the PC accounts. An invoice for the legal fees for the BHP has not been received yet, so should be chased. BR to provide draft text for the clerk to email to the EA. The sum for the Fenland gates and culvert rail and posts was discussed and the invoice for timber will be checked against various projects. Action: BR
There are still significant funds in the Oasis budget.
In the maintenance budget, there were extra grass cuts in July due to events, but nothing in August. The expenditure is within budget at present.
Thank you to NH and LC for their work to update the figures.
-
To receive an update on matters relating to potential grant applications and donations and agree any actions required. (HM/AB)
HM reported no further action on possible National Lottery funding. It was very complicated to apply and there were lots of subsequent reports to submit. She had looked at other sources, but they are very limited for Parish Councils.
BR reported that the solar energy company at Fiskerton are a possible source of grants for local schemes. This will be investigated.
District Cllrs had advised of significant grant opportunities currently available from WLDC.
AB is going to look at quotes for supplying power and water to the Oasis which might enable more groups to use the area in future. This was discussed at length. Comments included: Solar panels could be used to generate power for lighting; If many groups were to use the various buildings, it would need someone to supervise their use; It would probably require the provision of a toilet, but the service of this by a contractor would have to be paid for. Action: AB
Possible future flooding would have to be considered when planning usage.
-
To review 10th anniversary celebrations.
JR reported that someone had described the day as “quietly successful” which summed it up perfectly. The BHP was officially opened by Anne Welburn, watched by over 60 people. All those who attended the various activities on offer seemed to enjoy the weekend.
The foraging tour was well attended and greatly appreciated. Requests have been received for another such tour and VL is happy to accommodate this; the spring was suggested as a suitable time. The Forest Church walk was also successful, as were the tours which NH did. The bike trials had an enthusiastic but manageable number of cyclists. Thank you to all of those who assisted in various ways. Posts about the events on Facebook generated quite a few comments about what an asset Cherry Fields and the new path were, and many thanked the volunteers for the work they have done.
-
To receive an update on the “Behind the Hedge Path” and agree any actions required.
The path is now formally open and has been well trodden. Most of the hedge plants were doing well despite the drought conditions. It was noted that the path is likely to become boggy from October onwards. In the longer term it may prove desirable to make an all-weather path as far as Fenland Hideaway. It would cost around £10,000 for the same type of path as those in Cherry Fields.
Some areas need soil to raise them, and it is intended to seed the path when conditions improve.
-
The provision of a dog bin along the path between Cherry Fields and the Fenland Hideaway.
Fenland have asked for a dog bin to be provided as people are using their bins for disposal.
The EA will have to be asked for permission to install on their land first, then the Clerk can email WLDC about installation and emptying. There would be a one-time cost to the PC of £250.
It was resolved that this should be done. Action: BR -
The provision of a further bench along the path between Cherry Fields and the Fenland Hideaway.
The current bench is near the pumping station, but a second one has been requested nearer to FH. It was suggested we ask if anyone would like to purchase this bench. If there is any money left over in the budget it could be used to purchase another bench. Action: BR/JR -
The provision of a permanent board showing the circular route and estimated walk times.
The route map provided by GS has been laminated but a more permanent one would be useful, similar to the boards for trees and clouds. This will be considered further.
-
To receive an update regarding the Oasis area and agree any actions as required.
Thank you to all who installed the container. A base has now been laid, and the container reinstalled on the base. Thank you also to DS. Sturdy shelving is now required, including some large enough to take the mower etc and raise it above possible flood water. AB and LC have looked at this. The PC already has some shelving and some scaffold boards. It was resolved to spend up to £300 for metal storage racks, with the type to be decided by AB, NH, BR and DL.
NH said the next job was to collect wood so it could be offered to residents before it was too wet.
JR reported that one of the feral cats, which had been rehomed, has returned. Its care was discussed but it was agreed that the PC cannot take any responsibility for its care.
-
To receive an update regarding showing the main track from the road to the river as a permissive path on OS Leisure maps and agree any further actions as required.
No further updates yet; clerk to enquire. Action: Clerk
-
To receive an update on the LCC’s Countryside Walks for All series walk leaflet for Cherry Fields.
JR reported that quite a few leaflets were given out on the celebration day and were well received. They are also available in the library and anywhere else that other walks in the series are available.
We need to ensure that the main paths are kept accessible by everyone. This includes pruning the bush by the main entrance regularly. The path on the 10m strip is becoming narrow where weeds are encroaching so they may need spraying.
-
To note a local resident is undertaking the volunteering section of his Duke of Edinburgh award at Cherry Fields under the supervision of a member of the committee. (DL)
DL reported that his grandson is helping the volunteer team as part of his D of E scheme. He is always supervised.
-
To receive a report on work undertaken since the last meeting. (NH/BR)
*NH noted that there has been a lot of volunteer time recorded over the last four months. It was noted that they have collected a large number of black bags of rubbish from the Oasis for removal and a start has been made on repairing the bike track. Thank you to all the volunteers.
-
To review any matters arising from recent H & S inspections and agree any actions still required. (DL)
The annual H&S inspection will take place in mid-September. DL has just done an inspection. It was suggested that one of the dog signs has been removed. BR will check if there is a spare one to replace it. We cannot order single signs economically.
The deer antlers have still not been fixed. Other possible ways to fix them will be investigated.
New Rota: HM – September, JR/BR – October, CB – November, NH – December.
-
To review the programme of works for the forthcoming months and agree associated expenditure. (NH/BR)
*The access track needs work but will have to wait till the warmer weather next year and other higher priority jobs have been completed.
A second tree board has been suggested for the lower woodland. This could be a project, and NH will consider the design. He recommended using the same company who did the other three boards, which were standing up very well, in order to have a consistent design. It was resolved that we go ahead with the second tree board and obtain quotes. Action: NH
The fort and castle are coming to the end of their life and will need replacing at some point. Recycled plastic has been discussed but is very expensive and has some disadvantages. This will be looked at further.
There is a tree in the orchard which needs replacing. The purchase of a new tree was resolved. Action: NH
The BHP needs a new post for the farm access gate restraint, plus posts for the temporary exit chains. Timber was purchased for rollers under the container, and this will be repurposed as posts where required.
NH said that more stone is required round the container.
The clay pond lining has cracked because of the drought so may leak unless treated. More Bentonite may be required after November.
It was resolved that any remaining surplus tools from the Oasis can be taken by AG for refurbishment by Tools with a Mission. Action: AG
Someone has requested a compost bin. There are still several to dispose of. Action: JR
Saturday, 5th September will be a trial volunteer day to see if any different people come who are normally working during the week.
The wildflower meadow is due to be cut on Friday and DR will be asked to tedder the following week. The contractor will charge £300 and the hire of a tedder is £50.The 10m wide strip down to the delph also needs cutting and the contractor will be asked to do this. It was resolved to spend up to a total of £400 to cover these combined costs.
The hay can then be moved into the copses during the Saturday volunteer event.
BR reported that the contractors doing the new culvert will let us have a free load of soil. This can then be used to create bike humps down the side of the main track, plus fill in any cracks which have appeared in the overflow car park.
-
To consider the maintenance and project budget requests for 2027 – 2028 and resolve accordingly.
The BHP has had a separate budget heading so far but from April 2027 it will be included as an item within the normal CF budget. The Oasis will remain as a separate budget heading. Funds will be required for maintenance of the main track next year.
NH suggested that the maintenance fund at present is adequate. An allowance of £500 for the BHP was recommended. This would give a total maintenance budget of £3500. It was noted that there had been no increase for several years.
It was resolved to submit the following figures for the 2027-2028 budget: Maintenance £3500. Project £1000.
The allocation for grass cutting is likely to be around £2000.
The annual inspection cost is expected to be £100.
It was resolved to suspend Standing Orders so that the meeting could continue after 21.00.
-
To receive brief reports from members on actions/issues arising since the last meeting and resolve actions required (if not itemised on agenda above and dealt with already):
-
Health and Safety (AG/NH/BR) – Nothing further to report.
-
Grants (HM) – Nothing further to report.
-
Dyke maintenance (AG) – AG said the outflow pipe into the Delph will need inspecting before Winter to ensure there is no blockage. JR reported that we own a specialist rake for clearing blockages. Action: BR/AG/AB
-
Pond maintenance (NH/BR) – Nothing further to report.
-
Behind the Hedge Path (BR/NH) – Nothing further to report.
-
Oasis (NH/BR) – Nothing further to report
-
General path/track and site maintenance (BR/NH) – part of the path over the Delph bridge collapsed recently. Temporary repairs have been done, but these need to be more permanent.
-
Grass Cutting (BR/NH) – Invoicing needs to be checked. The RFO will be asked to send each invoice to BR for checking. Action: RFO/BR
-
Woodland and Meadow Project (NH) – One path through the meadow was not cut this year. A map will be provided next year.
-
Orchard (NH) – NH reported that there are still no volunteers to manage the orchard. JR has spoken to someone who would like to volunteer at the site, but she does not have any particular expertise.
-
Bike Track (BR) – Nothing further to report.
-
Dog exercise area and off lead strip (BR/NH) – Mowing of the 10m off-lead strip was discussed. CB said that hemlock seeds blow in from adjacent fields and need removing so mowing is preferrable. NH said mowing of the full width of this strip needs to be included in the specification for next year. The woodland walk should be removed from the spec. so they would offset each other. It was resolved that the grass cutting tender specification be modified to include the grass strip to the Delph and remove the woodland walk. Action: BR
-
Wildlife Camera (BR) – this is ready to move again. BR is considering a position on the BHP. Action: BR
-
Car Park and Gate-opening and closing (BR) – There have been two lock-ins recently, but the WhatsApp group has worked well to release them.
The catch on the height limiter is a bit stiff and needs attention. Action: BR/DL
-
General: Any other matters to report for inclusion in the next agenda.
NH has received positive comments about the ponds from the EA. They have started to do ecological surveys of their fields and ours which include the use of drones. He has asked for a copy of the survey when completed.
-
To confirm the date of the next meeting as Wednesday 11th November at 7pm.
The meeting closed at 21.19.
Signed ………………………………….
*Additional documents follow as appendices.
Appendix A: Projects budgets update
|
Available project funds :- |
|||
|
PC projects :- |
|||
|
Natural play equipment |
£1,000 |
||
|
Total PC funded projects |
£1,000 |
||
|
Grants and donations :- |
|||
|
- Carried forward |
£1,096 |
||
|
- Excess seat donation |
£58 |
||
|
- D Rogers |
£90 |
||
|
- Payment for damage to wildflower meadow |
£285 |
||
|
- Sale of Oasis tools etc |
£908 |
||
|
Total grants and donations |
£2,437 |
||
|
Orchard budget :- |
|||
|
- Carried forward |
£531 |
||
|
Total Orchard funds |
£531 |
||
|
Behind the Hedge Path budget :- |
|||
|
- Carried forward from 2025/26 |
£2,370 |
||
|
- Additional allocation of CIL funds |
£1,200 |
||
|
Total Behind the Hedge Path funds |
£3,570 |
||
|
Oasis restoration and development allocation :- |
|||
|
Total Oasis allocation |
10,000 |
||
|
Expenditure of PC projects funds :- |
|||
|
Unallocated |
£1,000 |
||
|
Total PC funded projects |
|
£1,000 |
£1,000 |
|
Expenditure of grants or donations:- |
|||
|
Unallocated |
£2,437 |
||
|
Total grant and donation funded projects |
£0 |
£2,437 |
£2,437 |
|
Expenditure of Orchard funds:- |
|||
|
Grease bands etc |
£100 |
||
|
Unallocated |
£431 |
||
|
Total community orchard fund projects |
£0 |
531 |
£531 |
|
Expenditure of Behind the Hedge Path project funds :- |
|||
|
Legal fees |
£1,600 |
||
|
First cut of existing hedge |
600 |
||
|
Digger hire |
£130 |
||
|
Digger hire |
£130 |
||
|
Fuel for wacker and hedge trimmer |
£10 |
||
|
April/May Volunteer vehicle fuel (BR) |
£300 |
||
|
Additional volunteer vehicle fuel (BR) |
£103 |
||
|
Expenses (BR) |
£79 |
||
|
Volunteer vehicle fuel (DR) |
£130 |
||
|
Timber and fixings for culvert bridge handrails |
£210 |
||
|
Fenland Hideaway gates and posts |
£154 |
||
|
Posts and chains for hedge gaps |
0 |
||
|
Digger hire |
132 |
||
|
Purchase from Amazon |
14 |
||
|
Screws and cable ties |
31 |
||
|
Purchase from Wickes |
3 |
||
|
Wildflower seed |
192 |
||
|
Signs |
193 |
||
|
|
£2,247 |
£1,764 |
£4,011 |
|
Expenditure of Oasis development and restoration funds :- |
|||
|
Purchase of 20 foot steel storage container and lock |
£2,440 |
||
|
Purchase of posts to act as rollers |
£200 |
||
|
Type 1 for raised base for container |
£312 |
||
|
Oak support beams |
£180 |
||
|
Landscape fabric |
£21 |
||
|
Digger hire for raised base construction |
£130 |
||
|
Replacement straining post at main gate |
£30 |
||
|
Skip hire |
£500 |
||
|
Tyre disposal |
£250 |
||
|
Volunteer plant use |
£10 |
£140 |
|
|
Fuel for power tools |
£40 |
||
|
Grass cutting contract |
£200 |
||
|
Gas safety check |
£100 |
||
|
Improvements |
£3,000 |
||
|
Contingencies |
£2,447 |
||
|
|
£3163 |
£6,837 |
10000 |
Appendix B: Maintenance budgets update
|
Allocation for contract mowing |
£2000 |
||||
|
Allocation for inspections |
£100 |
||||
|
Allocation for general maintenance |
£3000 |
||||
|
Item |
Actual |
Estimate |
Total |
||
|
Contract mowing (paths and picnic areas):- |
|||||
|
April |
£0 |
||||
|
May |
£214 |
||||
|
May |
£177 |
||||
|
June |
£74 |
||||
|
July |
£392 |
||||
|
July |
£428 |
||||
|
August |
£214 |
||||
|
September |
£214 |
||||
|
October |
£214 |
||||
|
Unallocated |
£73 |
||||
|
Total contract mowing |
£1,285 |
£715 |
£2,000 |
||
|
Inspections:- |
|||||
|
Annual cycle track inspection |
£100 |
||||
|
Unallocated |
|||||
|
Total inspections |
|
£100 |
£100 |
||
|
Other maintenance:- |
|||||
|
Witham Third drainage rates |
£100 |
||||
|
Volunteer fuel costs remaining budget (£900 allocated):- |
|||||
|
BR |
£125 |
||||
|
DR |
£90 |
||||
|
DR |
£30 |
||||
|
Remaining unallocated sum |
£255 |
||||
|
3 cans of fuel for small tools |
£24 |
||||
|
Replacement car park and dogs signs |
£68 |
||||
|
Timber preservative and builders' sand |
£69 |
||||
|
Timber preservative |
£70 |
||||
|
Wickes (?) |
£163 |
||||
|
Wickes (?) |
£3 |
||||
|
Hay mowing and tedder hire |
£350 |
||||
|
Unallocated |
£1,653 |
||||
|
Total other maintenance |
£618 |
£2,382 |
£3,000 |
||
Appendix C: Note of volunteer work undertaken between 2 May and 19 August 2026
Project development
No further project development work was undertaken on the main Cherry Fields area, but preparatory to absorbing the Oasis site, surplus tools and gardening materials were collected for a well-attended community “disposal day”, timber has been gathered for future use and wheelie bins returned to the District Council. Over 50 bags of rubbish have also been disposed of. The very tall willow hedge has also been cut down and stumps treated with glyphosate to prevent regrowth.
A new, secure Parish Council storage container has been delivered to the highest part of the Oasis site and is being installed on a raised mound to minimise the risk of flood damage.
Maintenance
During the last 16 weeks the volunteer group has caught up with a range of maintenance tasks including :-
-
Repairing the dog area gate
-
Pumping water into the lagoon on five occasions in an (ultimately abortive) attempt to maintain the water level
-
Creating an open water area in the centre of the lagoon with glyphosate spray, once it had completely dried out
-
Cleaning out silt from the reservoir
-
Patching a number of holes in paths and rebuilding the southwest pedestrian exit from the car park
-
Erecting a replacement set of car park signs and cleaning all the existing signs on site
-
Repairing a wobbly picnic table
-
Completely re-stringing the xylophone
-
Cutting back brambles and shrubs where they were beginning to overhang paths
-
Raising and resurfacing the approaches to the delph bridge to retain all-ability access and the treating the hand-rails with preservative. The bridge deck also needed an emergency repair after part of it collapsed
-
Undertaking remedial work on the cycle track surface
-
Infilling a number of large cracks on paths, mown grass and in the dog area.
Community orchard
The fruit on all apple trees has been ”singled” to improve the quality of the crop. Extension growth on the apple trees has also been pruned back. Water shoots have been removed from most trees and the last of the remaining mulch spread around the trunks of the fruit trees to retain moisture.
Behind the Hedge Path
Prior to the formal opening of the route :-
-
the most uneven sections were levelled
-
the culvert handrail completed and treated with preservative
-
a comprehensive set of signs erected
-
the first row of the rape crop (which was beginning to engulf the new hedge) cut back along the whole length of the path.
Volunteer input (between 2 May and 19 August 2026)
Project development (Oasis) 19 person days
Maintenance 26 person days
Gate opening 10.5 person days
Total Cherry Fields 55.5 person days
Behind the Hedge Path 22 person days
Appendix D: Project and maintenance work required over the coming months
Maintenance
The plastic inlet drainage pipe for the new dog area drainage pond is rather unsightly and, as soon as the water level falls, a stone revetment will be constructed using material donated by the W3IDB.
Sections of the cycle track have begun to sink into the peaty soil of Cherry Holt and have become wet and muddy. These will need raising by adding more road material from existing stocks.
The summer drought has resulted in the lagoon completely drying out. As a result the clay lining has cracked and this may result in significant leakage next year. Whilst it may be possible to re-puddle the lining by trampling, it may be necessary to augment this with a further application of Bentonite. Costs can be considered once the future condition of the lining becomes clearer.
Now the BHP is open and the backlog of Cherry Fields maintenance work has been dealt with, the volunteers will be turning their attention to constructing the proposed downhill cycle track alongside the main access track using existing stocks of subsoil.
The main access track is the most used section of the Cherry Fields path network and sections have begun to wear out. This may require resurfacing involving a significant amount of fresh sweepings and hire of a roller. Costs may be up to £300.
Project development
Whilst no significant further work is anticipated at present, it might be worth considering augmenting the interpretation boards by adding a “Fen Woodland” tree identification board to the Cherry Holt area.
Oasis restoration and development project
While the Parish Council is considering options for the future uses of the site, work to make it safe and remove materials which will not be required (tools, plastics, timber, metal, broken greenhouses, chicken run, bathtubs and tyres) will continue. Tyres are classed as controlled waste (because the toxins they contain can leach into the soil) and their disposal will need to involve a specialist contractor and may cost up to £300 and possibly considerably more. Although as many other materials as possible (eg metals and timber) will be reused or recycled, it will be necessary to hire a large (20 m2 ro-ro container) skip to dispose of the remainder (eg bath tubs) which may cost around £500.
Storage shelving is required for the new storage container and costs will be presented to a future meeting.
Community orchard
Broken stakes will continue to be replaced from stock as required.
A sponsored cherry tree, planted last Winter, failed to come into leaf this Spring and needs to be replaced at a cost of up to £60. Sufficient funds are available in the Community Orchard budget.
Behind the Hedge Path
Prior to the formal opening, the three gaps in the roadside hedge were blocked with demountable chains attached to recycled timber posts. The posts were not intended to be permanent and will have a limited lifespan, so it may be prudent to replace them with stouter, treated posts. The cost of timber and fixings would be up to £60.
Work days
The Committee agreed at its last substantive meeting to test the popularity of additional working parties on the first Saturday of the month, starting on 5th September. As this date is now approaching, consideration could be given to whether to undertake a significant task, such as resurfacing the main track, on such occasions.